BECOME A MANUFACTURER
The amount of investment runs up to 13,5 mio € to raise a regional factory (without real-estate) for a series production including the BAWAC water treatment unit. The needed surface runs to 4.300 m² roofed area and approx. 3.000 m² open land.

The time schedule to series production (manufacturing plant set up) is 14 months.

The production is scheduled at 6.300 units/yr (first year 2.500 units) in one shift (can be extended to 3 shifts per day).
The number of required staff depends on the daily unit production and the state of automatization. With a production of 6.300 units per yr. and an advanced series-production set-up approx. 355 members of staff are needed according to the present developed material-flow plans.

A further investment of 5 mio. € is needed for the production of installation-units. This includes the development and production of a drilling / installation / maintenance unit. A dynamic ultra-sonic-system is planned to facilitate 2 installations within 8 hours.

Please feel free to ask us for the investment-plan for your factory.